Satir Change Model

Change Fatigue

Change Fatigue

This is an interesting thread on LinkedIn from Chris Murman where he posited how to measure change fatigue?

I think it’s a good baseline for a short post. The essence of his post was how to measure it. I wonder if specifically measuring change fatigue is important or simply fatigue in general.

Here are some ideas to measure plan, old fatigue—

  • Lack of extending patience & grace

  • Not extending API (Assuming Positive Intent)

  • Low overall group energy levels

  • Silence, disengagement, or checking out

  • Persistently off cameras

  • Low curiosity